Loading...
HomeMy WebLinkAboutMinutes - WC - 08/30/2017 \4 P Commiss U , 1oners JCohasset Water Leonora C.rJenk Jenkins 1W D E P A R T M E N T John W. Steinmetz onesscr Rolf N. Gjesteby °w14.^' S677iW the C07nitt6rmo Since 1950 Minutes of the Cohasset Board of Water Commissioners 339 King Street— Water Treatment Plant August 30, 2017 @ 9:00 am Members Present: Leonora Jenkins, Chair John Steinmetz,Vice-Chair Rolf Gjesteby, Clerk Recording Secretary: Brenda Douglas Guests Present: Joe Geary & Carl Hillstrom of Woodard& Curran Rolf called the meeting called to order at 9:03 am., 2Id by John all in favor. Communication/SCADA Contract Lee asked if Joe felt that the monies they were appropriating$225,000 would be enough to cover the cost. Joe then explained the increase in cost. This would be because of the increased overseeing of the project. It could be a contractor that they are not familiar with and there would be much more overseeing of the project. John said that they can vote to approve contingent on approval from Chris Senior and Capital Budget approvals. John added the following verbiage to the end of the contract. "contingent on any and all necessary Cohasset town approvals". Rolf made a motion to accept the W&C offer to update the SCADA communications contingent on the approval of Capital Budget& Town meeting 2Pd by John all in favor. All three Commissioners signed the contract. Open Space Report Approval Carl had made some changes and updates to the report. There was a question as to if the board wanted to keep the section which refers to Norfolk Conveyor and the old land fill atop of Crocker Lane. Lee will check with Brian Joyce about the required testing at the sites. Rolf asked Carl about the sodium levels at the plant and Ellms Meadow. Carl stated that they are testing monthly at Ellms Meadow to get a trend. The sodium level from the pond and finished water is low, finished is at 30 and raw is at 22. 339 King Street,Cohasset,Massachusetts 02025 Tel:(781)383-0057 Fax:(781)383-2906 www.cohassetwater.org Rolf and Lee are concerned about the James Lane project especially when winter comes and the snow removal. Lee asked Carl if he had any ideas about signage. Lee suggested possibly getting in touch with the DPW. Lee would like to put up some sort of barrier at the entrance. John suggested that this be put on as an agenda item at a meeting. At a minimum signage, should be put up. The board then discussed possibly doing a regulation and bring it to town meeting. At the next meeting the board would like to invite DPW, Fire Chief,Brian Joyce, Chris Senior and also the developer of the James Lane project. Warrants were signed and approved. Rolf made a motion to approve the August 15, 2017 meeting notes 2"d by Lee all in favor. Joe said that the THM results are in and we are below the limits. Joe said that it is very close. John asked if Joe or Carl has any suggestions on how to reduce. Joe explained that they both think of this daily. Lee asked if it was due to the organics. Joe gave the board several ideas on what the board could do all of which are very expensive. The board would like to have Joe put together a list with approximate costs for the next meeting. Next meeting will be Tuesday, September 26 @ 9:00 am. Lee made a motion to adjourn meeting at 10:05 am 2"d by John all in favor. Respectfully Submitted, Brenda Douglas, Recording Secretary Approved By: ? -— Date: 9 / RolfN. Gjesteby, Clerk Cohasset Board of Water Commissioners 339 King Street,Cohasset,Massachusetts 02025 Tel:(781)383.0057 Fax:(781)383-2906 www.cohassetwater.org