HomeMy WebLinkAboutMinutes - WC - 05/23/2017 Cohasset Water Commissioners
RoIfN. Gjesteby
D E P A R T M E N T Leonora C. Jenkins
SBI" ff(1t2 awr�sure 1950 John W. Steinmetz
Minutes of the Cohasset Board of Water Commissioners
339 King Street—Water Treatment Plant
May 23, 2017 @ 9:00 am
Members Present: Rolf Gjesteby, Chairman
Leonora Jenkins, Vice-Chairman
John Steinmetz, Clerk
Recording Secretary: Brenda Douglas
Guests Present: Carl Hillstrom,Joe Geary, Glenn Pratt
Rolf called the meeting to order at 9:00 a.m. 2"d by Lee all in favor.
Reorganization of Water Commission
Rolf nominated Lee 2"d by John
Lee nominated John as vice 2"d Rolf
John nominated Rolf as clerk 2"d by Lee
Glenn Pratt approached the board and stated there are 120 radios in the system currently.
We are at the point where a 2"d repeater is needed due to high traffic. Years ago the
board gave $5,000. Rolf asked if Glenn has spoken to Chris Senior. Glenn explained
that he wants to meet with each department prior to going to town hall. John asked what
kind of money he was looking for from each department. Glenn stated between $1,000-
$1500.00. There is another issue which arose yesterday the connection to the antenna on
the Bear Hill tank. This should be approximately $300 per department. John made a
motion that the Water commission agree to pay$300 to replace the antenna on the Bear
Hill tank, 2"d by Rolf, all in favor.
In 2004 the water department purchased several parcels of land, Glenn supplied the board
with a map of the areas purchased. Lou Harvey has split off 6 acres and trying to sell off
as individual lots. Glenn wanted to know if the board would be interested in getting
involved in purchasing. John said they can't afford to buy but would back CPC.
Carl stated that there is funding thru the state about protection of the watershed. Joe will
look into it. There was review of monies left in capital projects. Since Mary Gallagher is
on vacation this will be tabled until next meeting. Lee asked how the expenditure budget
looked. I explained they are in good shape.
Verizon cancelled the conference call and have not heard from AT&T.
339 fling Street,Cohasset,Massachusetts 02025
Tel:(781)383-0057 Fax:(781)383-2906 www.cohassetwater.org
Woodard & Curran
Caustic Conversion is complete, but they found a pipe that needs to be replaced due to
corrosion. Carl said the pipe was order 3 weeks ago but it was lost but they will be
installing June 6 , Brad Small will be doing the work. Lee wanted to know when they
could expect to have it online. Joe said it should be online by the beginning of the fiscal
year.
Carl then spoke about the chemical consortium which was bid wrong and is being rebid.
Discharge permit was discussed. Carl explained that they are going to do 12 weeks of
testing to see where we are at meeting the 750-ppm maximum daily on 86 microns
monthly. Right now it does not look like we are going to meet the aluminum limits.
John asked if there were other options other than a new lagoon. Joe suggested possibly
getting chemical changes. John asked if there was a way to check to see if there are
coagulants to reduce the aluminum levels. John asked if they could shut us down, Carl
said no but they can impose significant changes which could cost a lot of money.
Flushing—No flushing this week due to THM's and bacteria sampling. Carl said that
they are half way thru the town.
Summer intern Brian Pumphret started yesterday and he will be painting hydrants and
then we will have him working in the lab.
Carl had someone come in yesterday to look at doing the benthic barrier as well as
vacuuming out front of the intake structure. We are waiting for quotes on the work. Lee
asked Carl about the weed growth in the pond. Carl said that they are already having
issues with weeds clogging the intake.
Dam repair—Monies are available July l'and Carl has reached out to Pare Engineering
to get a quote and he will be getting quotes on the grouting.
Looping—Carl has reached out to Greg Morse @ Morse Engineering waiting for quote.
John suggested that we reach out to Cavanaro Consulting for another quote.
Carl informed the board that he received a quote on the tube settlers upstairs in the
amount of$11,000. Joe has reached out for a cost to replace individual as well as all.
Lee asked for info to be supplied at the next meeting.
One of the raw water pumps has been pulled and sent out for repair. Carl also said one of
the high lift pumps needs to be rebuilt. Carl then told the board that the pond if the bound
brook construction is not completed soon may be an issue keeping the levels up in the
pond.
Commission Comments
John ran into Mike Milinoski and he commented that he is doing volunteer work with the
baseball league. Mike is trying to get water back to an area where there used to be a
spigot and said it was a small issue. It was explained that it would not be a small issue
due to the fact that a meter pit would need to be installed with a meter. They would then
339 Kng Street,Cohasset,Massachusetts 02025
Tel:(781)383.0057 Fax(781)383-2906 www.cDhassetwater.org
receive a water bill. There was a brief discussion what would be needed to including cost
of meter, excavation,plumber etc.
Lee spoke with Mary @ DPW and asked that the signs at dump state water/sewer bills
due June 1"
Communication Upgrade
Then there was a discussion about upgrading the communications and cameras. John
wanted to have a separate line item to discuss in more detail next month. The issue that
he board had was that the subcontractor fees were not broken down by task. Because
they were not broken out by area John would like to have Joe confirm numbers so that a
contract can be signed at the next meeting.
Next meeting Tuesday, June 27d' @ 9:00 am.
John had to leave meeting at 10:30 due to a prior commitment.
Lee asked if anyone has heard of anyone interested in cleaning up the raingardens. No
one has heard from anyone.
Ellms Meadow cleanup went well and Lee said that the large trees have been removed.
Lee would like to turn the area into a bird sanctuary.
Rolf made a motion to adjourn at 10:42, 2"d by Lee.
Respectfully Submitted,
Brenda Douglas, Recording Secretary
Approved By: Date 4� 2 7 G
Rolf Gjesteby, Clerk
Cohasset Board of Water Commissioners
339 King Street,Cohasset,Massachusetts 02025
Tel:(781)383-0057 Fax(781)383-2906 www.cohassetwater.org