Minutes of the Cohasset Board of Water Commissioners
339 King Street— Water Treatment Plant
October 22, 2014 @ 3:00 pm
Members Present: Leonora Jenkins, Chair
Rolf Gjesteby, Clerk
Recording Secretary: Brenda Douglas
Guests Present: Carl Hillstrom,Kevin McCarthy, Scott Henderson, Paul Sullivan& Mike
Roberts
Motion made by Lee seconded by Rolf to call the meeting to order at 3:00 pm all in
favor.
While the board was waiting for the other men to arrive from the 8 James Lane Project
the discussed the following: Lee stated that at the Selectmen's meeting last night there
was a discussion about the "Access Fee". She was told that the Access Fee was
confusing and it was suggested that we call it"Unmetered Capital Recovery Charge".
The capital recovery charge is based on the meter and that is why they suggest it. Rolf
stated that if it is acceptable to the selectmen is sounds good to him. Rolf made a motion
to change the terminology of the warrant article from access fee to Unmetered Capital
Recovery Charge. This was 2"d by Lee - all in favor.
The commission approved the warrants with one exception. Lee did not want to sign the
Deutsch Williams Brooks bill due to the fact that she did not know what charges were
involved. This bill was for August and there was nothing going on up at the Bear Hill
Tank and no one in Water had contact with Town Counsel. She will contact them
directly to find out exactly what was done.
8 James Lane
One of the developers, Mike Roberts, stated the Planning Board requested that they sit
down with the Water Commission to discuss the three issues that the board had.
The three issues are looping,blasting and snow removal.
Mike started by saying that at a town meeting they passed a bylaw to develop the
property. It was under this bylaw that they are allowed for a denser project. He stated
339 King Street, Cohasset, Massachusetts 02025
Tel: (781) 383-0057 Fax: (781) 383-2906 www.cohassetwater.org
that this was being done for the benefit of the citizens of Cohasset. He said that the town
was looking for more pedestrian traffic,tax revenue and an infusion of housing. They
purchased the property based on the bylaw.
According to the developer, the proposal has a lot of benefits, including the water main in
the street. 2" line from Pleasant to James Lane. This will also allow the Water
Department to charge for additional revenues. The original project was 19 units with
previous contractor to currently their project is 7 residential plus a commercial. Joe
Rosano will be developing his property and they feel just because they are the first ones
in that they should not be penalized for that.
The blasting people will be insured for$5 million but they cannot give you an iron clad
agreement that nothing will happen. They stated that they would agree to chipping if the
topic can be reviewed during the course of the project. Rolf asked if the MBTA was in
agreement with blasting and developer Paul Sullivan stated that they do not have an issue
and the MBTA will work closely with them. They stated that they will not blast as
requested,but hoped the board would look at it if the neighbors started complaining.
Developer's engineer, Scott Henderson, stated that with the elevation of the rock vs_ the
depth of the wells that it is highly unlikely to impact the wells. Scott stated that he spoke
with Norwell resident, Peter Dillon, and Peter stated he would be comfortable with an in-
depth study. It was hearsay that Peter Dillon indicated that it would not be a high risk
scenario. According to the engineer, Mr. Dillon indicated that he is not getting involved
with this on a professional basis and has made no qualifying remarks. The Developers
just used Mr. Dillon as an uncommitted resource. Lee asked how far below grade they
would be going. That is 8' from the top of the ledge. Lee then wanted to know about run
off. Everything that is coming down goes to Pleasant Street. With the exception of the
roof which will be drained off towards the wellfields. There will be a maintenance plan
in place for the cleaning of the drainage.
Rolf then asked what Carl thought about the blasting. Carl stated that he is still
concerned with damage potential, because the minimum $5 million in insurance that was
stated will not be enough to correct any damages.
The board was adamant that they are very uncomfortable with the blasting. They do not
want blasting.
Regarding looping, the proposal from Mike was to contribute by adding 4-5 sections and
a gate and agree to blow out the lines. Then when the Rosano property starts to get
developed the board can request that they complete the loop. Lee then stated that the
board has made other developers do loops in the past and if they made an exception for
them how would it look. Mike stated that the board should look at the size of the
development. The development on 3A has a lot more homes than what they have.
Rolf wanted to know what their plans were for snow removal. An area has been provided
out back for significant snow. The wall was also moved. They will have snow trucked
out. They stated that they have a project in Milton of condos where they have the snow
trucked out.
Lee suggested and the Board discussed the idea that if they will finish looping the line
then the Board will waive connection fees up to a maximum of$50,000 to cover the extra
costs incurred if chipping is needed for the 150' required to connect at the pumping
339 King Street, Cohasset, Massachusetts 02025
Tel: (781) 383-0057 Fax: (781) 383-2906 www.cohassetwater.org
station T. Then Rolf reiterated that C WD would reduce the connection fees to include
the rest of the looping. : approximately 150' of pipe, as the developers had stated they
would continue the pipe 90' from their property line toward the pumping station
connection. Once work is completed excluding the 90' which they have already agreed to
lay, the developers would have to show the board detailed bills for the additional footage
to see how much the board would reduce the connection fees.
Paul Sullivan then asked if there is any type of plan showing the pipe on James Lane.
Carl stated that there was not.
Motion made by Rolf to adjourn meeting at 4:55, 2°d by Lee, all in favor.
Respectfully Submitted,
Brenda Douglas, Recording Secretary
r
:1
Approved By: ```" �. 1_— - Date: 0/ / 12-.-, /ti
Rolf Gjesteby, Clerk
Cohasset Board of Water Commissioners