HomeMy WebLinkAboutMinutes - CC - 07/11/2019 Cohasset Conservation Commission
July 11,2019
APPROVED MINUTES
COHASSET CONSERVATION COMMISSION MEETING
THURSDAY, JULY 11, 2019
WILLCOTT COMMONS
IN ATTENDANCE: Justin Pimpare, Chair
Chris MacFarlane, Interim Vice Chair
Eric Eisenhauer, Member
Alex Koines, Member
James Rosebach, Member
Patricia Grady, Member
Kathy Berigan,Associate Member
Jeff Summers, Conservation Agent
Angela Geso, Conservation Administrator
ABSENT: Maryanne Wetherald, Member
Meeting called to order at 7:00 PM.
ANNUAL REORGANIZATION OF COMMISSION
Chair: Justin Pimpare Nominated by Eric Eisenhauer, 2nd by Chris MacFarlane, Vote 5-0 Unanimous
Vice Chair: Eric Eisenhauer Nominated by Justin Pimpare, 2nd by Chris MacFarlane, Vote 5-0 Unanimous
7:05 PM: NOI 19-14 Town of Cohasset— Manhole Cover Replacement
In attendance to represent agenda item: Dan Coughlin
Documents presented to support agenda item: NOI Application/Site Map
There are 83 manholes in various locations throughout town that will get new covers and collars.A small bobcat
may be used to remove the existing covers depending on what vegetation and other conditions exist. The new
covers should be less susceptible to cracking.
MOTION: By Chair Pimpare to issue a variance for NOI 19-14 for replacement of 83 manhole covers
in various locations throughout town for work within buffer zones.
SECOND: Member Koines
VOTE: 5-0 Unanimous
MOTION: By Member Koines to issue an Order of Conditions for NOI 19-14 for replacement of
manhole covers at various locations throughout the town.
SECOND: Member Eisenhauer
VOTE: 6-0 Unanimous
7:15 PM: RDA 19-09—30 Pleasant St— Marvell Homes—Fence Installation
In attendance to represent agenda item: Paul Sheerin Sr/Marvell Homes;Alix White, David Bigley/abutters
Documents presented to support agenda item: RDAApplication, Plans and Photos of Site
A split rail fence is going to be installed with hand-digging for 8 post holes within the buffer zone. Vice Chair
Eisenhauer feels that any work within a buffer zone that is not essential should not be approved and that
plantings could achieve the same effect with less intrusion than a fence. Mr. Sheerin asked if digging post holes
would cause any more disruption to the area than installing shrubs and other vegetation. Chair Pimpare said that
Commonwealth of MA Wetlands Protection Act see fences as exempt. The abutters felt that a fence would allow
for deer and wildlife to freely migrate.
MOTION: By Chair Pimpare to close the public hearing for proposed work at 30 Pleasant Street and
issue a Negative 3 determination for RDA 19-09 with the condition that all post hole
digging be done by hand.
SECOND: Member Koines
VOTE: 5-0 Unanimous
7:25 PM: NOI 19-12 42 Aaron River Road Waegerman Septic Upgrade
In attendance to represent agenda item: Rob Carlezon/Grady Consultants
Documents presented to support agenda item: NOI Application, Revised Plans
The septic system failed Title V. The system needs to be upgraded prior to sale of the house. Revised plans
dated July 1, 2019 reflect the leaching field being moved further away from the wetlands.
Cohasset Conservation Commission
July 11,2019
MOTION: By Member Koines to close the public hearing and issue an Order of Conditions for NOI
19-12 for a septic upgrade at 42 Aaron River Road.
SECOND: Member MacFarlane
VOTE: 5-0 Unanimous
7:25 PM: NOI 19-13 276 Beechwood Street—Galvin —Garage Addition
In attendance to represent agenda item: Rob Carlezon/Grady Consultants
Documents presented to support agenda item: NOI Application, Revised Plans
The applicant plans to replace the existing garage with a new garage that extends an additional 5-ft. extend the
existing garage within the buffer zone. There is no significant increase in impervious surface. The Commission
requests that a proposed silt sock be brought in closer to the area of construction.
MOTION: By Member Koines to issue a variance for work within the buffer zone for proposed work
at 276 Beechwood Road.
SECOND: Member MacFarlane
VOTE: 5-0 Unanimous
MOTION: By Chair Pimpare to close the public hearing and issue an Order of Conditions for NOI 19-
13 with the condition that a revised plan be submitted to move the silt sock closer to the
construction area.
SECOND: Member MacFarlane
VOTE: 5-0 Unanimous
7:35 PM: NOI 19-09 15 Brook Street Norton Garage Conversion Continued from 616119
In attendance to represent the agenda item: Brendan Sullivan/Cavanaro Consulting; Jim Norton/Applicant;
Abutters David and Jennifer Loren (19 Elm St)
Documents presented to support agenda item: Revised Plans
The applicant wants to convert an existing garage to an apartment. There will be additional plantings and a
mitigation plan in place.A crushed stone parking area will allow for better infiltration than a paved impervious
area. Vice Chair Eisenhauer is concerned that an existing elm tree will be negatively impacted from the site
development. Brendan Sullivan said that all efforts will be made to preserve the tree but if there are roots
attached to ledge that need to be removed it could affect the tree. Jennifer Loren is concerned with their privacy
being compromised if the tree is removed.Agent Jeff Summers said that if there was a proposal to remove the
tree it would include mitigation and replication but the applicant is making serious efforts to preserve the tree.
Chair Pimpare brought up the 4 parking spaces vs. 2 and feels the Commission must address any unpermitted
work done within the 50-ft. buffer zone. He also feels that while the applicant has a right to rebuild on the same
footprint he would prefer that the lot be restored to its previous condition with two parking spaces.
CONTINUED TO JULY 25, 2019
8:10 PM: After-the-Fact Stormwater Permit 19-15, 149 King Street/Shannon - Unpermitted Tree Removal
CONTINUED TO AUGUST 8, 2019 AT APPLICANT'S REQUEST
8:30 PM: Discussion: Open Space Committee/Tom Callahan —Trails Project
This concerns the Barnes and Wheelwright properties in the North Main StreeUForest Avenue area.
Improvements are needed to re-establish the trails. There is a proposed Eagle Scout project that would clear
some of the growth, add small directional signs for the different trails and install a bench. The Commission will
consider this project upon receipt of an RDA application.
Certificates of Compliance Issued:
NOI 16-14: 28 Black Horse Lane, raze and rebuild single family dwelling/Greene
NOI 17-03: 92A Beach Street, add pier with float and gangway/Weltman &Atkins
Minutes for Approval:
Minutes for 2/28/19, 3/28/19 and 4/11/19 were jointly approved by a unanimous vote of 5-0.
With no further business to discuss motion to adjourn made by Member MacFarlane, 2"d by Alex Koines
and passed by a unanimous vote of 5-0.
Meeting adjourned at 9:30 pm.