March 30, 2017
APPROVED MINUTES
COHASSET CONSERVATION COMMISSION
DATE: Thursday, March 30, 2017
TIME: 7:00 PM
PLACE: Willcutt Commons, Sohier Street, Chart Room
IN ATTENDANCE: Justin Pimpare, Vice-Chair
Jack Creighton, Member
Edward Graham, Member
Patrick Kennedy, Member
Jeff Summers, Conservation Agent
ABSENT: Patrice Vogelman, Chair
Alex Koines, Member
Andrea Buffum, Secretary/Treasurer
Eric Eisenhauer, Associate Member
Chris MacFarlane, Associate Member
Meeting called to order at 7:16
7:15 PM: 3, 9, 15 Diab Lane—SWP 16-36, 16-37, 16-38 - Shannon ,(con't from 212117)
In attendance to represent agenda item: Matthew Shannon/Applicant; John
Cava na ro/Cavan aro Consulting; Attorney Richard Henderson; Joshua
Bows/Merrill Engineering; Abutters Deidre and Peter Hobson, Clifford and
Elaine Breslow, Tom Bell, Kevin Heine, Ellen Freda, Amy Glasmeier, Steven
M_agnell
Documents presented to support agenda item: Merrill Consulting Review
Report— Diab Lane 316117 • Planting Plan Upper Lot; Planting Plan Middle Lot;
Planting Plan Lower Lot; Grading Revisions: 3127/17 Letter with photo
attachments from Kevin McKeon
Meeting called to order at 7:16 pm.
At the meeting on 2/2117 the Commission voted to solicit a 3ro party consultant to conduct an
independent Peer Review. Five firms submitted proposals and Merrill Engineering of Hanover was
selected. Josh Bows of Merrill presented his findings. Among many other things, he stated that
several plans were missing for the submittal. He asked that the impervious surfaces be more clearly
depicted on the plans; that run-off patterns need additional calculations to ensure the provisions on
the plan do not have a negative impact on the abutters; that more information is needed on ledge
removal; and that slab elevation relative to groundwater and direct discharge be addressed. He also
stated that test pits were missing and should be performed.
It was agreed by all parties that test pits should be done to examine the subsurface conditions more
thoroughly. The applicant will conduct the test pits and will coordinate a time with Merrill Engineering
to observe and notify Conservation staff 48 hours prior to testing_ Abutters were told that due to
Conservation Commission Minutes
March 30, 2017
liability issues they would not be allowed on the construction site but can observe the testing from
the road.
Applicant agreed to revise the report based on the findings of test pit data and submit such report to
staff by April 14, 2017 Merrill Engineering will review and provide comments to the revbised report
by April 21, 2017. Hearing is continued to April 27, 2017 at which time. Revised versions reflecting
the findings from Merrill Engineering will be presented by Cavanaro Consulting along with results
from the test pits.
Approval of Minutes
March 2, 2017: Motion to approve by Member Kennedy, 2nd Member Graham, 3-0 (1 abstention)
March 16, 2017: Motion to approve by Member Kennedy, 2nd Member Graham, Vote 4-0 unanimous
It was decided to cancel the meeting on April 13 as it was determined there would not be a quorum.
All agenda items will be rescheduled pending availability of Conservation commissioners, applicants
and their representatives. Staff will notify all involved.
48-Hour Rule: 73 Atlantic (formerly 70 Whitehead —Sullivan
A plan to remove the portion of fill in the buffer zone and stockpile it in another location on the site
has been presented to staff. The proposal says "restoration plan" but the commission requested that
"restoration" be replaced with "removal'. Agent Summers said that since the Stormwater Permit for
the site has been violated, all fill needs to be removed. The owner needs to submit a plan
addressing fill removal from the entire property and not just wetlands. Agent Summers also
suggested an independent Peer Review for the removal plan before any restoration plan can be
submitted.
MOTION: By Member Creighton to issue an Enforcement Order with a condition that the
applicant submit a full Fill Removal Plan by April 13,2017.
SECOND: Member Graham
VOTE: 4-0 Unanimous
Motion to adjourn at 9:20 made by Member Kennedy, seconded by Member Graham and voted 4-0.
MINUTES APPROVED BY THE CONSERVATION COMMISSION: "off r
n
F
R
SIGNED BY CONSERVATION CHAIR: