Loading...
HomeMy WebLinkAboutMinutes - CBC - 10/22/2018 Capital Budget Committee October 22, 2018 Minutes Approved 11/5/2018 3-0 CBC Members Present: Wakeman, Donohue, Host, Franklin, Lyons Mr. Wakeman opened the meeting at 1900 with the above quorum present. Aaron River Dam ($240,000) and other STM Items Leonora Jenkins presented details on the proposed maintenance and repairs to the Aaron River Dam, which includes some structural repairs and removal of trees, vegetation and debris. Engineering plans and specifications are complete and once they clear Conservations Commission, bids will be solicited. Funding for this work would come from Retained Earnings whose current balance was estimated to be $700,000. Anticipated Water Dept items for ATM included Roof Repairs ($180,000) and a Replacement Vehicle ($50,000), the funding for which would come from the Capital Stabilization Fund. Work on the Cedar Street Main Loop ($400,000) would be bonded by the Town. VOTE: A motion was made and seconded to endorse the Aaron River Dam maintenance and repairs at a cost of $240,000 and such motion was approved by a vote of (3-0) Tide Gate Generator ($25,000) Conversation continued on the best solution to provide power to the tide gate during outages. The idea of bringing a power source to the tide gate was vetted and the cost $240,000 plus cost of the transfer switch was stated to bring underground power to the tide gate. The potential of partnering with the privately owned Cohasset Harbor Inn was suggested as worthy of investigation. Finally, the weight of the gate and the size of the motor would potentially be to heavy and demand too much amperage for a battery-powered solution to effectively handle. Road Salt Experiment Jason stated that the town was working with a vendor to run a test program to measure the results of the pre-wetting technique. We will outfit one of our vehicles with (2) 70-gallon saddle tanks and will spray an environmentally friendly, molasses- based liquid on our roads prior to salting. If the results are positive, the town will move forward with the road treatment method. The cost of the truck outfit is $8,250. 3A Land Purchase No materials were presented, however, Chairman Wakeman confirmed that the price to purchase the $350,000, and any such purchase would be subject to the parcel passing environmental testing. CBC members felt that a potential land use discussion was warranted. VOTES: A motion was made and seconded to approve the minutes of August 8, 2018 and such motion approved by a vote of (4-0) A motion was made and seconded to approve the minutes of October 14,2018, and such motion approved by a vote of (4-0) There being no further business we voted to adjourn at 20:05 Respectfully submitted Susan Franklin