Loading...
HomeMy WebLinkAboutMinutes - CBC - 02/01/2016 Capital Budget Committee February 1, 2016 Minutes Approved 3/7/2016 CBC Members Present: Wakeman, Dormitzer, Franklin, Host, Keniley Chair Wakeman opened the meeting at 1900 with the above quorum present. General Discussion Chairman Wakeman stated that there are approximately $2.3M in requests for FY17. The CPC has received requests from the Recreation Department and the Harbormaster. It was communicated that Chris Senior asked Ron Menard to consider whether the Voice Over IP Phone System could be pushed forward to FYI from FY18. Member Domitizer met with Menard and shared the highlights of his meeting with the committee. Menard shared his plan for Fiber and Peripherals. The plan is costly but there were anticipated saving from current practices, such as $60K in savings on Comcast/Verizon Access Points, reduction in data centers from 7 to 2, ability to (in the future) move from local printing to centralized printing. Dormitzer mentioned that Cohasset is well behind in infrastructure compared to Duxbury, Marshfield, Hingham, and Scituate, who all have fiber networks. He reiterated that the committee understands this and is committed to improving the Town's infrastructure, however, he and others on the committee felt the plan as presented needed more work. Chairman Wakeman stated he would contact Menard to obtain more details. Brian Joyce, Town Engineer provided information on the Jerusalem Road Causeway Elevation and the Replacement of the Cunningham Bridge. The Cunningham Bridge will take an estimated 9 months to complete and the work is currently targeted to occur between August of 2017 and May 2018. It will be necessary to have an alternative access route in place during the construction season. The existing access route would include an area of Jerusalem Road prone to flooding which in a recent storm was impassable. A Hazard Mitigation Grant for that project was recently extended. The fee for environmental impact to the salt marsh is $14.80 sq ft * 3200 sq ft = $47,360. The project entails tearing up the existing road, elevating the roadway, repaving and installing a wooden guardrail. Unspent Appropriations were discussed and Chairman Wakeman updated the Capital Budget Spreadsheet to reflect changes. Next meeting was scheduled for February 16, 2016, There being no further business we voted to adjourn at 2100 Respectfully submitted Susan Franklin